IMPROVEMENT


The HSE-MS is continuosly review by the management to ensure that its effectiveness, suitability and objectives are not compromised.

Integrated Geophysical/Geological Services

 

Workstation based, we utilize a range of software including the SMT Suite, Petrel,Eclipse Rockwell, etc.

 

a) 2D/3D Seismic data processing:
This involves the use of WINDOWS based software (RSA) to deduce advanced 3D post-stack seismic attribute calculation and 2D/3D post stack processing and Analysis using (Trace Pak) package

 

b) 2D/3D Seismic Interpretation:
This involves structural mapping (fault pattern maps) in time and depth on in-lines, cross-lines and arbitrary lines using 2d/3dPAK application. Digitizing multiple fault segments (normal/reverse) in cross-sections and log correlation of structural /stratigraphic events across adjacent wells/fields, using the EarthPAK software. Interpretation of horizons on seismic data and digitizing /editing faults on one or more attributes volumes using the VuPAK software.

c) Geologic/Reservoir Modeling:
Generation of simple, complex and theoretical Earth models in 2D with the user-defined parameters using the ModPAK software.

Integrated Mudlogging services

We provide full Integrated Mud logging Services to clients. In addition, we provide experienced wellsite geologists and assist in training client's personnel to achieve desired proficiency. Our services include, but not limited to:
• Formation Evaluation
• Well Surveillance
• Pore Pressure prediction
• Well Safety Monitoring

Geographic Information System (GIS) Services

With our new Dakota workstation, we parade one of the best leading software with various capacities in, Design and Management of GIS databases, Digitizing and printing of existing maps at user defined scales and updating and reviewing of maps.

Ciscon specializes in the running and handling of Oilfield Tubular.   Our range of tubular services includes Casing and Tubing make up and break-out, with sizes from 1" to 36" OD.

Ciscon's Casing and Tubing crew deploy either a 4 or 6 Cylinder Duetz Power Unit or an Electrical Power Unit which, can deliver up to 40,000 ft 1 b of torque to our different hydraulic power tongs. CISCON has now standardized on the Clincher Hydraulic Power Tongs from above 2" to 30" for better performance.

With our Flush Mounted Spider and other heavy equipment handling tools, we are capable of handling strings of up to 750 tons and bail up to 32 feet in depth. We deploy our FLUSH MOUNTED SPIDER (FMS) regularly for easier casing handling on all our rig engagements.

A Quick Stab Top Drive Fill-up and Circulating Tools (FAC Tool) from 7" to 20" OD casing sizes, are available for filling casing and establishing circulation during casing operations.

Ciscon's Tubular unit handles all sizes of tubing during the Completion of any well with an array of equipment such as Dual Tools, thread protectors, spiders/elevators, drifts, stabbing guides, lifting nubbings, slips, pickup elevators, hydraulic and manual tongs and torque turn computers.

Our computerized Torque Turn equipment is used to run tubulars with premium threads. In this case, the computer monitors and records the torque and turn values and the maximum make-up RPM which automatically signals the status of the connection against a known "finger print" for the particular thread and size of tubing.